Separate fixed and variable costs
Break-even math depends on assigning costs to the right bucket.
Fixed costs
These remain in the model even at zero units within the chosen time period.
Variable costs
These increase with each unit sold or delivered.
Mixed costs
If a cost has both components, split it or model multiple scenarios.